Quick Answer
Start with the target device, port, link distance, fiber type and document needs. Then use the article content below to narrow the model path before sending an RFQ.
Currently wireless service providers are interested in a DWDM approach over CWDM in their fronthaul networks to improve their capacity significantly without installing new fiber cables. The existing DWDM approach using fixed-wavelength DFBs causes high operational expenses (opex), including the inventory cost for DFBs to cover a variety of channels. polymer-based external cavity tunable SFP+ for CWDM wireless fronthaul network in 2009. Now, tunable SFP+ transceiver can reduce opex significantly, since it can be used to support any DWDM channel regardless of the allocated wavelength via the colorless nature of its tunable laser. Moreover, it supports the plug-and-play operation, which enables fast, easy, and cost-effective installation and maintenance. Professor : Very innovative and there is potential market demand. Having low cost tunable lasers for front haul applications is a problem and this product offers a solution."
Compatibility Checklist
Before requesting pricing, collect the details that affect coding review and quote quality.
Device information
Device brand, model, firmware or OS version, target port and required module code.
Link information
Required reach, fiber type, connector, wavelength plan and deployment environment.
Purchase context
Quantity, destination country, required delivery target and packaging or labeling needs.
Proof documents
Datasheet, catalog, test report request, certificate path or inspection record requirement.
FAQ
What information is needed for compatibility review?
Submit brand, device model, firmware or OS, target port, required module code and quantity.
Can I request a datasheet before ordering?
Yes. Use the datasheet center or RFQ form to request the current file version for the target model.
What should I include in an RFQ?
Product variant, quantity, country, target device, reach, connector, required documents and deployment notes.
Where can I review testing or compliance paths?
Use the Testing & Quality and Certifications & Compliance pages, then request project documents through the RFQ.